null

Pavement & Tile Protection

During the construction of buildings, it may be necessary to lay the new pavement or tiles before all the works are completed. This can give rise to a situation where deliveries are still required and the only way in is to drive over the pavement or tiled areas. This can lead to tile damage as the areas may not be able to bear the loads of the delivery vehicles or forklifts. Our heavy duty Portable Roadway products have been used with success in these applications by dispersing the vehicle loads and acting as a protective barrier for the pavers by preventing vehicle wheels making direct contact.